Technical advice
Strip Out and Decommissioning

Strip out and asbestos/lead remediation with management of construction site logistics – 9 rue Percier / 26 rue de la Baume, Paris

Project description

Strip out and asbestos/lead remediation with complete management of site logistics at the real estate complex located in the 8th arrondissement of Paris. The activities included the selective removal of internal elements (floors, cladding, false ceilings, partitions and building systems), treating surfaces containing lead and the remediation of materials containing asbestos.

The site was organized using an integrated logistics management system, including traffic, equipment, scaffolding, entrances, site preparation and maintenance of the operational areas.

Il cantiere è stato organizzato con un sistema integrato di gestione logistica, comprendente viabilità, allestimenti, ponteggi, accessi, cantierizzazione e manutenzione delle aree operative.

Client:
Confidential
Site:
9 rue Percier / 26 rue de la Baume
Year:
2019
crossmenuchevron-down